Skip to main content
A PWD Approved Contractor

The Attakulangra-Thiruvallam stretch, spanning 135 meters, has been severely impacted by heavy flooding, causing significant damage to the area’s infrastructure. The floodwaters have eroded the road surface, weakened its foundation, and disrupted drainage systems, making the area highly susceptible to further deterioration and posing safety risks to commuters. Urgent repair and rehabilitation work is required to restore the damaged stretch, including rebuilding the road, reinforcing embankments, and improving drainage to prevent future flooding. These efforts are critical for ensuring the safety of the local population, maintaining connectivity, and preventing recurring flood-related damages in this vulnerable area.